1887
|
Construction
from the south halted at Ellwood in Goleta Valley (Dec.
21).
|
|
1889
|
Track-building
from the north reaches Santa Margarita in San Luis Obispo
County (January).
|
|
1891
|
Construction begins on Cuesta Grade above San Luis Obispo
(December).
|
|
1892
|
Work begins on first of seven Cuesta tunnels (April).
|
|
1894
|
Track
from north reaches San Luis Obispo; town celebrates first
trains (May 4).
|
|
1895
|
Rails reach Pacific Ocean at Grover near Pismo Beach (January).
|
|
|
Work
on bridge to span Santa Maria River commences (February; bridge
completed in June).
|
|
|
First
train reaches town of Guadalupe in Santa Maria Valley (July
1).
|
|
1896
|
Rails from north reach Someo, later renamed Casmalia (Jan.
30).
|
|
|
Santa Ynez River Bridge completed (December).
|
|
1897
|
Little
progress on Coast Route construction was made in 1897 and
throughout much of 1898.
|
|
1898
|
Rails reach Honda Creek, five miles south of Santa Ynez River
and two miles north of Point Arguello (December).
|
|
1899
|
Honda
Viaduct completed (July).
|
|
|
Construction
of 451-foot viaduct across Jalama Creek begins (October; completed
in January, 1900).
|
|
1900
|
"Tunnel 13" between Drake and Sacate, about five
miles west of Gaviota, is completed (January).
|
|
|
Rails reach Point Conception (February).
|
| |
After
12 years have elapsed, track-laying from the south resumes
at Ellwood (March 15).
|
| |
Fill
completed at Cojo, three miles east of Point Conception (March
23).
|
| |
Rails from south reach Eagle Canyon, west of Goleta (March
29).
|
| |
S.P.
President C.P. Huntington and William Hood, S.P. Chief Engineer,
conduct an inspection trip to end-of-track (late March).
|
| |
First construction train pulls into Naples, four miles west
of Ellwood (April 7).
|
| |
661-foot
Dos Pueblos Canyon Bridge completed (May).
|
| |
Tracks from north reach Alegria, four miles west of Gaviota
(May).
|
1900
(cont'd.)
|
Gap
is reduced to 17.9 miles, from Cuarta Canyon (Sacate) to Gato
Canyon, between Naples and Capitan (June 30).
|
| |
C.P.
Huntington, last of the "Big Four" founders of the
Central Pacific/Southern Pacific railroads dies (Aug. 13).
|
| |
634-foot Alegria Canyon Viaduct is completed (September).
|
| |
Thompson Bridge Co. derrick topples while being moved between
Refugio and Corral canyons; replaced by derrick from Los Angeles
Breakwater project (Mid-October).
|
| |
61-foot bridge over Refugio Creek is completed (Late October).
|
| |
Crews
complete Arroyo Hondo Bridge (541 feet long; (Late November).
|
| |
811-foot
trestle at Gaviota is opened (Dec. 12).
|
| |
Gap
is closed when last spike is driven at Cementerio, 23 miles
west of Goleta (Dec. 31); first train passes over the Cementerio
Bridge at about 7 p.m.
|
|
1901
|
Full train service begins on the Coast Line from San Francisco
to Los Angeles (March 31).
|
| |
CONTINUE:
3.
Goleta
Depot: The Southern Pacific Years, 1901-1975.
|